The counter-flashing is the metal piece embedded in the wall that covers the top of the base flashing and prevents water from getting behind it. When it fails, water infiltration almost never appears in the right place, which explains why so many leaks at the wall-to-roof junction are diagnosed too late.
Key Points
- A joint flashing always consists of two parts: a base flashing installed with the roofing and a counter-flashing anchored to the wall.
- The Quebec Building Code requires that the counterflange be recessed at least 25 mm into the masonry.
- It must cover the masonry to a height of at least 150 mm and overlap the base flashing byat least 100 mm.
- Elements installed in the direction of the slope must overlapby at least 75 mm, for both the base flashing and the counter-flashing.
- Minimum thicknesses for metal flashings: 0.33 mm for galvanized steel and copper, 0.48 mm foraluminum, and 0.35 mm for zinc.
- An exposed valley flashing requires a sheet of metal at least 600 mm wide.
- Caulking is not a substitute for flashing: it seals a joint that has already been properly designed; it does not replace it.

A counter-flashing embedded in the mortar, covering the stepped base flashing.
What is the actual purpose of a counter-flashing?
On a sloped roof, the junction with a wall, chimney, or parapet is the natural weak point. The base flashing follows the roof’s slope and extends up the wall. If it stopped there,water running down the wall would end up behind it. The counter-flashing extends down from the wall and overlaps this upward extension, so that every drop of water is directed back toward the roof surface.
This is based on the principle of gravity-fed drainage, not chemical sealing. A well-designed joint remains watertight even as the sealant ages, because the geometry does the work. This is why a flashing against a poorly fitted wall will eventually start to leak, even if it’s resealed every year.
What the Code requires at the junction of a roof and a wall
The requirements are found in the subsection on junction flashings in the Building chapter. A flashing must be installed at the junction between the roof and the walls rising above it. For a shingle roof meeting masonry, the junction is protected by a base flashing and a counter-flashing, the latter embedded at least 25 mm into the masonry, extending over the masonry by at least 150 mm, and overlapping the base flashing by at least 100 mm.
On a wall that is not made of masonry, the approach changes: the wall flashing extends at least 75 mm beneath the underlayment and at least 75 mm toward the roof, and the staggered sections overlap by at least 75 mm. On a multi-layer waterproofed roof, a batten is installed at the junction, and the membrane extends at least 150 mm up the wall.
These values may seem insignificant on paper. But on a construction site in Montreal, they make the difference between a repair that lasts twenty years and one that needs to be redone after three winters.

The minimum values to check at the junction of a roof and a masonry wall.
Materials, their design, and their minimum thickness
The Code specifies a minimum thickness for each metal. Galvanized steel and copper are 0.33 mm, zinc is 0.35 mm,aluminum is 0.48 mm, and lead is 1.73 mm. These are minimum requirements, not design recommendations. On a flat roof, the same logic applies to the membrane overlay and its metal protection.
In practice, the choice of materials is based on three criteria: galvanic compatibility with the roofing material and fasteners, resistance to de-icing salt, and appearance. An aluminum counter-flashing against a pre-painted steel roof works well as long as the contact points are insulated. Copper remains the material of choice for heritage buildings in the Plateau and Old Montreal, where replacement with identical materials is required.
Prefabricated products are available for standard applications, but most joints in Montreal duplexes require a custom-bent sheet metal part, because the masonry is never perfectly plumb.
Chimneys, skylights, and other openings
The chimney is the most challenging case. It consists of a stepped base flashing, a recessed counter-flashing on all four sides, and—if its width exceeds 750 mm—a saddle on the upstream side that divides the flow. The entire assembly must be treated as a single unit, never as four separate parts.
Skylight flashing follows the same principle. A skylight typically comes with a flashing kit from the manufacturer, sized in inches to fit its exact frame, and the design of this connection has already been validated at the factory. The pitfall is mixing the kit with improvised parts: this disrupts the manufacturer’s intended overlap, leading to water infiltration at the upstream corner. As for roof flashings for plumbing vents, they age primarily due to their rubber gasket, which should be checked during every inspection.
The Steps for a Compliant Installation
The installation always follows the same sequence, regardless of the type of roof.
Step 1: Cut the groove into the mortar to a depth of about one inch using a saw, not a chisel. Step 2: Install the base flashing along with the roofing material—either stepped shingles or a membrane with an upfold on a flat roof. Step three: Insert the bent counter-flashing into the groove, mechanically secured, then sealed. Nails and screws remain above the waterline—never in the exposed portion—to avoid creating holes where water runs off.
A meticulous installation is judged by the details: folded corners rather than cut ones, proper material overlap along the entire length, and expansion joints provided on large surfaces. The roofing manufacturer’s technical data sheet specifies the work covered by its warranty, and it is this document that takes precedence when a detail is not described in the Code.
This type of installation is the responsibility of licensed roofing contractors. A partial repair is possible on an isolated section, but as soon as an entire roof slope is affected, the repair must be planned in conjunction with the rest of the roof. For plumbing vents, each vent receives its own flange, and the gutter screen must never rest on the downspout flashing.

On a flat roof, the up-folded membrane is protected by a continuous counter-flashing.
How to Identify a Flashing That Has Reached the End of Its Service Life
There are some telltale signs. A strip of cracked black sealant running the entire length of the wall indicates that an attempt has already been made to repair a failing joint. A flashing strip simply resting on the brick—without any saw marks or notches—has never met the required 25-mm recess. A wavy or lifted section indicates uncontrolled expansion.
Inside, damage often appears far from the point of entry: a water stain at the top of a wall, blistered paint at a ceiling joint, or a musty smell in the attic. Our article on leaky roofs and immediate steps to take covers what to do before professional help arrives, and the roof inspection guide explains how these issues are assessed.
When there is still uncertainty about the path of the water, thermal imaging of the roof and attic can help pinpoint the damp area without having to open up the ceiling.
Repair: Replace the flashing or just the counter-flashing?
When replacing a roof, best practice is to install new base flashing under the existing metal counter-flashing, provided that the counter-flashing is sound and properly engraved. If there is no engraving, if the brick is crumbling, or if the mortar is cracked,the counter-flashing must be reinstalled at the same time as the masonry; otherwise, the new roof will rest on a compromised joint.
Two trades intersect here: the roofer and the mason. Coordinating the two jobs is less expensive than having to reopen the joint a year later. The Régie du bâtiment du Québec reminds homeowners that this work must be performed by a contractor holding the appropriate license. When planning a roof maintenance schedule, the annual inspection of roof joints is the most cost-effective item on themaintenance calendar. The cost of repairing a joint is nowhere near as high as the cost of damage caused by water infiltration left unaddressed for another year.
Factors That Affect the Cost and Duration of a Pipe Joint Repair
Two roofs with the same surface area do not require the same amount of work. The number of joints matters more than the surface area: a house with two chimneys, three skylights, and a shared wall poses more risks than a large, bare roof slope. The cost of a re-roofing job therefore depends on the number of linear meters of flashing, the condition of the mortar, access to the work site, and the metal chosen, withaluminum remaining more affordable than copper for the same total area.
The slope also affects the resources required. For slopes less than 4 inches per foot, the work is done on level ground with a simple anchor; for steeper slopes, fall protection and scaffolding are required, which extends the duration of the project. Reputable contractors itemize these costs in their bids rather than providing a lump-sum figure.
Request the technical data sheet for the products being offered and details on the installation: type of stepped flashing, product thickness, anchoring method, treatment of existing holes, and self-adhesivewaterproofing membrane under the upstand. If a gutter guard or snow retention system is located nearby, its removal and reinstallation are part of the repair—not an extra charge discovered along the way.
A well-designed joint from the start costs less than even the best repair job. That’s the design principle to keep in mind: you either pay once for the geometry, or every year for sealant and interior damage.
Improperly installed flashing is visible inside before it becomes visible on the roof
We inspect the wall-roof junction, measure the actual embedment and overlap, and then redo the flashing according to the Code’s specifications. Residential, commercial, or institutional—anywhere in Montreal.
Contact us for information about your roofing questions.
Frequently Asked Questions About Flashing
What is the difference between a flashing and a counter-flashing?
The base flashing is installed with the roofing material and extends up the wall. The counter-flashing starts at the wall and extends back down over it, with an overlap of at least 100 mm on the masonry. Together, they form a gravity-sealed joint.
Can a counter-flange be repaired by caulking?
Sealant serves as a temporary measure to get through the winter. It never corrects a poor overlap or a lack of flashing, and it merely masks the problem until water reaches the wooden substrate.
How often should joints be inspected?
Once a year, ideally in the fall, and after any episode of strong winds or hail. The inspection covers the sealant, the anchoring, any metal deformation, and the condition of the mortar around the engraving.
Can an aluminum flashing strip come into contact with a steel roof?
Direct contact between different metals accelerates corrosion. The parts are separated by a membrane or a compatible fastener, or the same metal is used for the entire joint.
Is a back flashing required everywhere?
The Code requires flashing at the junctions between the roof and the walls rising above it, unless its absence does not compromise the structural integrity of adjacent structures. At a masonry junction, the combination of base flashing and counter-flashing is the prescribed solution.